Range Rover Evoque: Oil Pump

Removal

NOTES:

Some illustrations may show the engine removed for clarity.

Some variation in the illustrations may occur, but the essential information is always correct.

Removal steps in this procedure may contain installation details.

1. Refer to: Specifications (414-01 Battery, Mounting and Cables, Specifications).

2. WARNING: Make sure to support the vehicle with axle stands. Raise and support the vehicle.

3. Refer to: Timing Cover (303-01B Engine - GTDi 2.0L Petrol, Removal and Installation).

4. Refer to: Air Cleaner (303-12B Intake Air Distribution and Filtering - GTDi 2.0L Petrol, Removal and Installation).

5. Refer to: Air Conditioning (A/C) Compressor - GTDi 2.0L Petrol (412-01 Climate Control, Removal and Installation).

6. Refer to: Engine Oil Draining and Filling (303-01B Engine - GTDi 2.0L Petrol, General Procedures).

7. CAUTION: Using a suitable tool, hold the oil pump gear when removing the centre bolt.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

8.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

9. Torque: 8 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

10. Torque: 25 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

11. Torque: 35 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

12. Torque: 4 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

13.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

14. Torque: 10 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

15. NOTE: During installation tighten the bolts simultaneously or crosswise.

Torque:

Range Rover Evoque. Engine - GTDi 2.0L Petrol

Installation

1. NOTE: Make sure that all traces of the old sealant are removed from the mating faces. To install, reverse the removal procedure.

2. NOTES: Install a new gasket.

Note - Apply sealant WSE-M4G323-A6 in a 2-3mm diameter on the engine oil sump as shown. The component must be installed and tightened within 10 minutes of sealant application.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

3. NOTE: Note - TAS | Engine | Apply sealant WSE-M4G323-A6 in a 2-3mm diameter on the engine front cover as shown. The component must be installed and tightened within 10 minutes of sealant application.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

READ NEXT:

 Timing Chain

Removal NOTES: Some illustrations may show the engine removed for clarity. Some variation in the illustrations may occur, but the essential information is always correct. 1. Refer to: Specifications

 Timing Cover

Special Tool(s) 303-021 Engine support bracket JLR-303-1591 Lifting Bracket, Engine - Rear Removal NOTES: Some illustrations may show the engine removed for clarity. Some variation in the illustratio

 Valve Cover

Removal NOTES: Some illustrations may show the engine removed for clarity. Some variation in the illustrations may occur, but the essential information is always correct. Removal steps in this proc

SEE MORE:

 Fuel Tank and Lines - Component Location

Component Location COMPONENT LOCATION - ROW Connection to purge valve Fuel Low Pressure (LP) sensor Fuel fired booster heater - fuel supply pipe connection (if fitted) LP fuel supply pipe Fuel fired booster heater - fuel supply pipe (if fitted) Fuel pump delivery module Fuel tank breather p

 Child seat positioning

Crash statistics show that children are safest when properly restrained in a child or infant restraint system that is secured in a rear seating position. Information given within the table is correct at the time of going to press. However, availability of child restraints may change. Pl

© 2011-2025 Copyright www.rrevoque.org