Range Rover Evoque: Block Heater

Removal

1. Refer to: Cooling System Partial Draining, Filling and Bleeding (303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).

2. Refer to: Engine Undershield (501-02 Front End Body Panels, Removal and Installation).

3. Refer to: Front Bumper Cover (501-19 Bumpers, Removal and Installation).

4. NOTE: Measure and mark a 70mm section of the pipe using the clamp as a guide.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

5. NOTE: Discard the bolt and clamp.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

Installation

1. Torque: 20 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

2. Torque: 6 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

3. NOTE: Using a suitable tool, cut a 70mm gap from the coolant pipe.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

4. Torque: 3 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

5. CAUTION: Protect the surrounding paintwork and body from the movement of the cutting blades.

NOTE: Following the indent on the bumper and using a suitable tool, cut a 26mm hole in the front bumper cover.

6.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

7. Refer to: Front Bumper Cover (501-19 Bumpers, Removal and Installation).

8. CAUTION: Make sure the retaining clip is secured correctly.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

9.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

10. NOTE: Make sure all ground connections are correctly installed. Torque: 10 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

11. Fill the engine coolant and test the block heater for correct operation.

Refer to: Cooling System Partial Draining, Filling and Bleeding (303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).

12. Refer to: Engine Undershield (501-02 Front End Body Panels, Removal and Installation).

READ NEXT:

 Fuel Charging and Controls - GTDi 2.0L Petrol

 Fuel Charging and Controls - Component Location, System Operation and Component Description

Component Location COMPONENT LOCATION Overview OVERVIEW The 2.0L GTDi engine is equipped with a high-pressure direct injection system controlled by the ECM (engine control module). A high-pressure f

 Throttle Body

Removal NOTES: Removal steps in this procedure may contain installation details. Some illustrations may show the engine removed for clarity. 1. WARNING: Make sure to support the vehicle with axle sta

SEE MORE:

 Torque Converter Seal GTDi 2.0L Petrol

Special Tool(s) 307-597 Installer, Torque Converter Seal 307-613 Holding Pins, Torque Converter Removal NOTE: Some variation in the illustrations may occur, but the essential information is always correct. 1. WARNING: Make sure to support the vehicle with axle stands. Raise and support the vehicle.

 Engine - Component Location, System Operation and Component Description

Component Location EXTERNAL VIEW Overview OVERVIEW The 2.0L Gasoline Turbocharged Direct Injection (GTDi) engine is an in-line, double overhead camshaft, 4 cylinder engine, which is transverse mounted in the engine compartment. The engine weight is kept to a minimum by using aluminum for the cyli

© 2011-2026 Copyright www.rrevoque.org