Range Rover Evoque: Oil Pump

Removal

NOTES:

Some illustrations may show the engine removed for clarity.

Some variation in the illustrations may occur, but the essential information is always correct.

Removal steps in this procedure may contain installation details.

1. Refer to: Specifications (414-01 Battery, Mounting and Cables, Specifications).

2. WARNING: Make sure to support the vehicle with axle stands. Raise and support the vehicle.

3. Refer to: Timing Cover (303-01B Engine - GTDi 2.0L Petrol, Removal and Installation).

4. Refer to: Air Cleaner (303-12B Intake Air Distribution and Filtering - GTDi 2.0L Petrol, Removal and Installation).

5. Refer to: Air Conditioning (A/C) Compressor - GTDi 2.0L Petrol (412-01 Climate Control, Removal and Installation).

6. Refer to: Engine Oil Draining and Filling (303-01B Engine - GTDi 2.0L Petrol, General Procedures).

7. CAUTION: Using a suitable tool, hold the oil pump gear when removing the centre bolt.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

8.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

9. Torque: 8 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

10. Torque: 25 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

11. Torque: 35 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

12. Torque: 4 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

13.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

14. Torque: 10 Nm

Range Rover Evoque. Engine - GTDi 2.0L Petrol

15. NOTE: During installation tighten the bolts simultaneously or crosswise.

Torque:

Range Rover Evoque. Engine - GTDi 2.0L Petrol

Installation

1. NOTE: Make sure that all traces of the old sealant are removed from the mating faces. To install, reverse the removal procedure.

2. NOTES: Install a new gasket.

Note - Apply sealant WSE-M4G323-A6 in a 2-3mm diameter on the engine oil sump as shown. The component must be installed and tightened within 10 minutes of sealant application.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

3. NOTE: Note - TAS | Engine | Apply sealant WSE-M4G323-A6 in a 2-3mm diameter on the engine front cover as shown. The component must be installed and tightened within 10 minutes of sealant application.

Range Rover Evoque. Engine - GTDi 2.0L Petrol

READ NEXT:

 Timing Chain

Removal NOTES: Some illustrations may show the engine removed for clarity. Some variation in the illustrations may occur, but the essential information is always correct. 1. Refer to: Specifications

 Timing Cover

Special Tool(s) 303-021 Engine support bracket JLR-303-1591 Lifting Bracket, Engine - Rear Removal NOTES: Some illustrations may show the engine removed for clarity. Some variation in the illustratio

 Valve Cover

Removal NOTES: Some illustrations may show the engine removed for clarity. Some variation in the illustrations may occur, but the essential information is always correct. Removal steps in this proc

SEE MORE:

 Restraints Control Module (RCM)

Removal NOTES: The RCM must be replaced after every time any SRS component has been deployed. Removal steps in this procedure may contain installation details. 1. Make the SRS system safe. Refer to: Standard Workshop Practices (100-00 General Information, Description and Operation). 2. Disconnect

 Front Inner Quarter Panel

Removal NOTES: The front inner quarter panel is manufactured from mild steel. The front inner quarter panel is to be unpicked from the inner quarter panel, it is not serviced separately. There are NVH components on this panel, they are not serviced on the new panel. If damaged, new components wi

© 2011-2025 Copyright www.rrevoque.org