Range Rover Evoque: Cylinder Head
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
1. Refer to: Battery Tray (414-01 Battery, Mounting and Cables,
Removal and Installation).
2. Refer to: Cooling System Draining, Filling and Bleeding (303-03B
Engine Cooling - GTDi 2.0L Petrol, General Procedures).
3. Refer to: Camshafts (303-01B Engine - GTDi 2.0L Petrol, Removal
and Installation).
4. Refer to: Intake Manifold (303-01B Engine - GTDi 2.0L Petrol,
Removal and Installation).
5.

6. Remove the special tool.

7.

8.

9.

10.

11. CAUTION: Using suitable tie straps, make sure the
turbocharger assembly is secure.

12. CAUTIONS:
Make sure that all openings are sealed. Use new blanking caps.
Be prepared to collect escaping coolant.
- Carefully remove and discard the oil seal.

13.

14.

15.

16.
- Remove and discard the cylinder head gasket.

Installation
1.
- Clean the components mating faces.

2. CAUTION: Apply sealant WSE-M4G323-A6 in a 5-7mm diameter
on both cylinder head gasket notches as shown. The cylinder head
and engine front cover must be installed and tightened within 30
minutes of sealant application.

3.
- Clean the component mating faces.

4. CAUTION: Cylinder head bolts may be reused a maximum of
two times only.
NOTE: Tighten the bolts in the indicated sequence.
Torque:
- Stage 1: 7 Nm
- Stage 2: 15 Nm
- Stage 3: 55 Nm
- Stage 4: 90
READ NEXT:
Engine Mount LH
Removal
NOTES:
Removal steps in this procedure may contain installation details.
Some variation in the illustrations may occur, but the essential information is
always correct.
1. Di
Removal
NOTES:
Removal steps in this procedure may contain installation details.
Some illustrations may show the engine removed for clarity.
1. WARNING: Make sure to support the vehicle with axle sta
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
2. Disconnect the battery
SEE MORE:
Torque Specifications
Front Door Module (FDM)
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. Disconnect the battery ground cable.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
2. Refer to: Front Door Trim Panel (501-05 Interior
When removing or installing flexible hydraulic pipes and hoses, make sure
that the following procedures are observed to
make sure component serviceability:
Prior to removal, clean area around hose or pipe end which is to be
disconnected.
Obtain appropriate blanking plugs or caps before disconn
© 2011-2025 Copyright www.rrevoque.org
