Range Rover Evoque: Cooling Fan

Removal

NOTES:

Removal steps in this procedure may contain installation details.

Some variation in the illustrations may occur, but the essential information is always correct.

1. WARNING: Make sure to support the vehicle with axle stands. Raise and support the vehicle.

2. Refer to: Cooling System Partial Draining, Filling and Bleeding (303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).

3. Refer to: Air Conditioning (A/C) System Recovery, Evacuation and Charging - GTDi 2.0L Petrol (412-00 Climate Control System - General Information, General Procedures).

4. Refer to: Condenser - GTDi 2.0L Petrol (412-01 Climate Control, Removal and Installation).

5. Torque: 5 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

6.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

7.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

8. Torque: 5 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

9.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

10.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

11. CAUTION: Take extra care not to damage the component.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

12.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

Installation

1. To install, reverse the removal procedure.

Coolant Expansion Tank

Removal

1. Refer to: Engine Upper Support Insulator (303-01B Engine - GTDi 2.0L Petrol, Removal and Installation).

2. CAUTION: Correct installation of the Coolant expansion tank cap can be obtained by tightening the cap until an audible click is heard.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

3. Using a syringe, remove the cooling fluid from the expansion tank.

4. Torque: 10 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

5. NOTE: Do not disassemble further if the component is removed for access only.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

Installation

1. To install, reverse the removal procedure.

Engine Coolant Level Switch

Removal

NOTE: Removal steps in this procedure may contain installation details.

1. Refer to: Coolant Expansion Tank (303-03B Engine Cooling - GTDi 2.0L Petrol, Removal and Installation).

2. NOTE: Do not disassemble further if the component is removed for access only.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

Installation

1. To install, reverse the removal procedure.

READ NEXT:

 Cooling System Partial Draining, Filling and Bleeding

Draining CAUTIONS: The engine cooling system must be maintained with the correct concentration and type of anti-freeze solution to prevent corrosion and frost damage. Failure to follow this instructi

 Engine Cooling - Diagnosis and Testing

Principles of Operation For a detailed description of the cooling system, refer to the relevant Description and Operation section in the workshop manual. REFER to: (303-03B Engine Cooling - GTDi 2.0L

 Block Heater

Removal 1. Refer to: Cooling System Partial Draining, Filling and Bleeding (303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures). 2. Refer to: Engine Undershield (501-02 Front End Body Panel

SEE MORE:

 Powered tailgate opening height

The maximum opening height can be set as required. This is useful in parking areas with low ceiling heights or just for ease of use. 1. Open the tailgate to the position which you want to set as the maximum height. Press any tailgate control to stop movement at the required position. Final pos

 Diesel Fuel System Health and Safety Precautions

WARNINGS: Fuel may not give adequate warning before toxic or harmful effects arise. Exposure to fuel can be harmful and can cause severe health damage or death. Provide adequate ventilation when working on fuel systems. Extreme care must be exercised when handling hot fluids. Always wash off spi

© 2011-2025 Copyright www.rrevoque.org