Range Rover Evoque: Oil Cooler
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
2. Disconnect the battery ground cable.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
3. Refer to: Cooling System Partial Draining, Filling and Bleeding
(303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).
4. Refer to: Engine Oil Draining and Filling (303-01B Engine - GTDi 2.0L
Petrol, General Procedures).
5. Refer to: Engine Cover - GTDi 2 0L Petrol (501-05 Interior Trim and
Ornamentation, Removal and Installation).
6.

7. CAUTION: Make sure that the area around the
component is clean and free of foreign material.
READ NEXT:
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
Removal steps in this proc
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
Removal steps in this proc
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
1. Refer to: Specifications
SEE MORE:
Map split screen
1. TMC (Traffic Message Channel)
information.
2. North is up.
3. Small compass display which always
indicates North.
4. Next direction display.
5. Current vehicle position.
6. Vehicle direction arrow.
7. Split screen.
8. Split screen scale/zoom setting.
9. Current stree
Removal
NOTE: The front bumper mounting is manufactured from HSLA300 and mild
steel.
1. In this procedure, to make sure the vehicle is correctly aligned, it must
be placed on
an approved alignment jig.
2. The front bumper mounting is replaced in conjunction with:
Front bumper cover
Front bumper
© 2011-2025 Copyright www.rrevoque.org
