Range Rover Evoque: Block Heater

Removal

1. Refer to: Cooling System Partial Draining, Filling and Bleeding (303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).

2. Refer to: Engine Undershield (501-02 Front End Body Panels, Removal and Installation).

3. Refer to: Front Bumper Cover (501-19 Bumpers, Removal and Installation).

4. NOTE: Measure and mark a 70mm section of the pipe using the clamp as a guide.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

5. NOTE: Discard the bolt and clamp.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

Installation

1. Torque: 20 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

2. Torque: 6 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

3. NOTE: Using a suitable tool, cut a 70mm gap from the coolant pipe.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

4. Torque: 3 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

5. CAUTION: Protect the surrounding paintwork and body from the movement of the cutting blades.

NOTE: Following the indent on the bumper and using a suitable tool, cut a 26mm hole in the front bumper cover.

6.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

7. Refer to: Front Bumper Cover (501-19 Bumpers, Removal and Installation).

8. CAUTION: Make sure the retaining clip is secured correctly.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

9.

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

10. NOTE: Make sure all ground connections are correctly installed. Torque: 10 Nm

Range Rover Evoque. Engine Cooling - GTDi 2.0L Petrol

11. Fill the engine coolant and test the block heater for correct operation.

Refer to: Cooling System Partial Draining, Filling and Bleeding (303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).

12. Refer to: Engine Undershield (501-02 Front End Body Panels, Removal and Installation).

READ NEXT:

 Fuel Charging and Controls - GTDi 2.0L Petrol

 Fuel Charging and Controls - Component Location, System Operation and Component Description

Component Location COMPONENT LOCATION Overview OVERVIEW The 2.0L GTDi engine is equipped with a high-pressure direct injection system controlled by the ECM (engine control module). A high-pressure f

 Throttle Body

Removal NOTES: Removal steps in this procedure may contain installation details. Some illustrations may show the engine removed for clarity. 1. WARNING: Make sure to support the vehicle with axle sta

SEE MORE:

 Starting a disabled vehicle using booster cables

Rotating parts of the engine can cause serious injury. Take extreme care when working near rotating parts of the engine. Before attempting to start the disabled vehicle, make sure that the parking brake is applied, or suitably chock the wheels. Make sure that Park is selected or the manua

 Accessing navigation

From the Home menu touch the On road nav soft key. Alternatively press the NAV hard key on the facia. A caution screen will be displayed. If the navigation screen language has not been set, now is the time to set it. Select Language, make a selection and confirm it by touching the OK soft key.

© 2011-2025 Copyright www.rrevoque.org