Principle of Operation
For a detailed description of the locks, latches and entry systems and
operation, refer to the relevant Description and
Operation section of the workshop manual REFER to: Handl
Control Diagram
NOTE: A = Hardwired; F = RF transmission; N = Medium speed CAN (controller
area network) bus; O = LIN (local
interconnect network) bus.
Instrument cluster
CJB (central junction bo
Removal
NOTES:
The RCM must be replaced after every time any SRS component has been
deployed.
Removal steps in this procedure may contain installation details.
1. Make the SRS system safe.
Refer to: Standard Workshop Practices (100-00 General Information,
Description and Operation).
2. Disconnect