Range Rover Evoque: Oil Cooler
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
2. Disconnect the battery ground cable.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
3. Refer to: Cooling System Partial Draining, Filling and Bleeding
(303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).
4. Refer to: Engine Oil Draining and Filling (303-01B Engine - GTDi 2.0L
Petrol, General Procedures).
5. Refer to: Engine Cover - GTDi 2 0L Petrol (501-05 Interior Trim and
Ornamentation, Removal and Installation).
6.

7. CAUTION: Make sure that the area around the
component is clean and free of foreign material.
READ NEXT:
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
Removal steps in this proc
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
Removal steps in this proc
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
1. Refer to: Specifications
SEE MORE:
Consists of two menu screens. Icons for the second menu are shown
individually.
Navigation controls
See 104, TOUCH SCREEN OVERVIEW.
1. Move to other Navigation menu.
2. Cancels current route guidance.
3. Provides a choice of options for entering a
destination.
4. Will display previous des
Changing a road wheel
1. Temporary spare wheel locking ring.
2. Temporary spare wheel retaining bolt.
3. Tool kit retaining bolt.
4. Jack.
5. Wheel brace.
After use, the tool kit
should be
returned to the under floor storage
area and correctly stowed.
The spare wheel is heavy and if
h
© 2011-2025 Copyright www.rrevoque.org
