Principle of Operation
For a detailed description of the locks, latches and entry systems and
operation, refer to the relevant Description and
Operation section of the workshop manual REFER to: Handl
Control Diagram
NOTE: A = Hardwired; F = RF transmission; N = Medium speed CAN (controller
area network) bus; O = LIN (local
interconnect network) bus.
Instrument cluster
CJB (central junction bo
Removal
NOTE: If a new Active on-demand coupling module is installed, the throttle
valve must also be installed.
1. WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
2.
3. CAUTIONS:
Make sure that the area around the component is
clean and free of foreign m
Removal
NOTE: Removal steps in this procedure may contain installation details.
All vehicles
1. Disconnect the battery ground cable.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
2. WARNING: To avoid accidental deployment, the restraints
control module backup power