Component Location
Steering gear
Rubber seal assembly
Heat shield
Overview
The vehicle is fitted with EPS (electric power steering), provided by a ZF
Servolectric steering gear unit with variab
Special Tool(s)
205-754A
Splitter, Ball Joints
502-012
Alignment Pins, Subframe
General Equipment
Transmission jack
Removal
CAUTION: Nuts and bolts must be tightened with the weight of the vehicle
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
2. Disconnect the battery ground cable.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
3. Re
Special Tool(s)
310-123
Locking Ring, Fuel Tank
Removal
WARNINGS:
Wait for a minimum of 1 minute after the engine has stopped before
carrying out any repair to the fuel injection
system.
Avoid flames, sparks or lighted substances.
CAUTION: Be prepared to collect escaping fuel.
NOTE: Removal step