Range Rover Evoque: Oil Cooler
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
2. Disconnect the battery ground cable.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
3. Refer to: Cooling System Partial Draining, Filling and Bleeding
(303-03B Engine Cooling - GTDi 2.0L Petrol, General Procedures).
4. Refer to: Engine Oil Draining and Filling (303-01B Engine - GTDi 2.0L
Petrol, General Procedures).
5. Refer to: Engine Cover - GTDi 2 0L Petrol (501-05 Interior Trim and
Ornamentation, Removal and Installation).
6.

7. CAUTION: Make sure that the area around the
component is clean and free of foreign material.
READ NEXT:
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
Removal steps in this proc
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
Removal steps in this proc
Removal
NOTES:
Some illustrations may show the engine removed for clarity.
Some variation in the illustrations may occur, but the essential information is
always correct.
1. Refer to: Specifications
SEE MORE:
If the vehicle is equipped with memory seats,
when reverse gear is selected the door mirrors
can be set to automatically adjust, providing an
improved viewing angle of the curb side for
reversing. The Reverse-dip mirror feature
must be switched on. See 56, VEHICLE
INFORMATION AND SETTINGS MENU
CAUTION: LH illustration shown, RH is similar.
NOTE: Removal steps in this procedure may contain installation details.
All vehicles
1.
2.
3.
4. Torque: 1.4 Nm
5. Torque: 20 Nm
6. NOTE: LH side only.
7.
5-door
8.
9. CAUTION: Take extra care not to damage the
clips.
Release the lower retainin
© 2011-2025 Copyright www.rrevoque.org
