Capacities
Fuel System Pressure Release GTDi
2.0L Petrol
Draining
1. Refer to: Petrol and Petrol-Ethanol Fuel Systems Health and Safety
Precautions (100-00 General Information, Description and
Operat
Removal
NOTES:
The A-pillar outer panel is manufactured from mild steel. The fender
mounting bracket is serviced on the new panel.
The upper and lower butt joint must be MIG brazed due to the location of a boron
reinforcement.
A new anti tamper VIN indentification decal will be required when rep
Removal
WARNINGS:
To avoid accidental deployment and possible personal injury, the backup
power supply must be depleted before
repairing or replacing any air bag supplemental restraint system (SRS)
components. To deplete the backup power supply
energy, disconnect the battery ground cable and wait