Range Rover Evoque: Module Communications Network

READ NEXT:

 Central Junction Box (CJB)

Removal CAUTIONS: If a new component is to be installed, the Land Rover approved diagnostic equipment must be connected prior to removal, the data must then be downloaded from it and the keys (remote

 Battery Junction Box (BJB) TD4 2.2L Diesel

Removal NOTES: Removal steps in this procedure may contain installation details. Some variation in the illustrations may occur, but the essential information is always correct. All vehicles 1. Refer

 Battery Junction Box (BJB) GTDi 2.0L

Removal NOTES: Removal steps in this procedure may contain installation details. Some variation in the illustrations may occur, but the essential information is always correct. All vehicles 1. Refer

SEE MORE:

 Front Halfshaft RH LHD AWD/RHD AWD

Special Tool(s) 205-857 Remover, Halfshaft Removal CAUTIONS: Nuts and bolts must be tightened with the weight of the vehicle on the suspension. Do not allow halfshafts to hang unsupported at one end or joint damage will occur. Make sure the halfshaft constant velocity (CV) joints do not over art

 Communications Network - Diagnosis and Testing

Principles of Operation For a detailed description of the Communications Network, refer to the relevant Description and Operation sections in the workshop manual. Inspection and Verification CAUTIONS: Diagnosis by substitution from a donor vehicle is NOT acceptable. Substitution of control modules

© 2011-2025 Copyright www.rrevoque.org